Bidding · Session 6
Creating a New Bid
about 20 minutes
GoalBuild a real bid start to finish: due date, customer, pricing, scope — saved as a draft you can send.
Click New Bid (top right of the dashboard, or from the Bids page). The builder opens with the most important field first.
- Set the bid due date. The banner at the top runs a live countdown — “Due in 12 days” — and turns urgent as the date closes in. This is the deadline that runs your week; set it before anything else.
- Pick the customer. Type in the search box under Project Details. If the GC isn't in your list yet, the dropdown's last row offers + Add “name” as new customer — it creates them on the spot. An Also bidding to row lets you add other GCs bidding the same job.
- Name the project — e.g., Riverside Medical Center.
- Add assemblies. Click Add Assembly and pick from your templates — each bundles materials, shop labor, vendor services, and field labor into one priced item. Set the quantity and hit Calculate.
- Add line items for anything not covered: description, CSI division (auto-suggested from the description), quantity, unit, unit cost. Pull rates with From cost book, or Import CSV on the bid detail page.
- Write Notes & Assumptions — “steel quote good for 48 hours,” “assumes ground-floor access.” These save with the bid and show on its Details tab.
- Check the Scope card. Your scope library's default template pre-loads inclusions, exclusions, and clarifications — tick what applies to this job.
- Save as Draft. The bid gets the next quote number in your sequence and lands in your pipeline.
The Bid Summary sidebar totals as you go — materials, shop hours, vendor, field, markup percentage, and margin — so you watch the number build instead of discovering it at the end.
Try it yourself
- Create a bid with a due date three days out and watch the countdown banner.
- Add one assembly and one manual line item, then set markup and read the margin.
- Type a brand-new GC name and add them from inside the customer search.
Key takeaways
- Due date first — the countdown banner runs the urgency from there.
- Assemblies price bundled work; line items catch the rest; the cost book feeds both.
- Notes & Assumptions and the Scope card carry your qualifications with the bid.
- Drafts get a quote number and appear in the pipeline immediately.
Practice this in the live demo
A fully loaded sample company — every module open, no sign-up, nothing you can break.
Open the live demo