All tutorials

Bidding · Session 6

Creating a New Bid

GoalBuild a real bid start to finish: due date, customer, pricing, scope — saved as a draft you can send.

Click New Bid (top right of the dashboard, or from the Bids page). The builder opens with the most important field first.

  1. Set the bid due date. The banner at the top runs a live countdown — “Due in 12 days” — and turns urgent as the date closes in. This is the deadline that runs your week; set it before anything else.
  2. Pick the customer. Type in the search box under Project Details. If the GC isn't in your list yet, the dropdown's last row offers + Add “name” as new customer — it creates them on the spot. An Also bidding to row lets you add other GCs bidding the same job.
  3. Name the project — e.g., Riverside Medical Center.
  4. Add assemblies. Click Add Assembly and pick from your templates — each bundles materials, shop labor, vendor services, and field labor into one priced item. Set the quantity and hit Calculate.
  5. Add line items for anything not covered: description, CSI division (auto-suggested from the description), quantity, unit, unit cost. Pull rates with From cost book, or Import CSV on the bid detail page.
  6. Write Notes & Assumptions — “steel quote good for 48 hours,” “assumes ground-floor access.” These save with the bid and show on its Details tab.
  7. Check the Scope card. Your scope library's default template pre-loads inclusions, exclusions, and clarifications — tick what applies to this job.
  8. Save as Draft. The bid gets the next quote number in your sequence and lands in your pipeline.
The Bid Summary sidebar totals as you go — materials, shop hours, vendor, field, markup percentage, and margin — so you watch the number build instead of discovering it at the end.

Try it yourself

  • Create a bid with a due date three days out and watch the countdown banner.
  • Add one assembly and one manual line item, then set markup and read the margin.
  • Type a brand-new GC name and add them from inside the customer search.

Key takeaways

  • Due date first — the countdown banner runs the urgency from there.
  • Assemblies price bundled work; line items catch the rest; the cost book feeds both.
  • Notes & Assumptions and the Scope card carry your qualifications with the bid.
  • Drafts get a quote number and appear in the pipeline immediately.

Practice this in the live demo

A fully loaded sample company — every module open, no sign-up, nothing you can break.

Open the live demo